Explain the inspection and test after installation of the electric hoist.

Explain the inspection and test after installation of the electric hoist.

07 Nov 2020

Electric hoist is divided into two types: wire rope electric hoist and chain electric hoist. It is a small lifting equipment. The electric hoist has the characteristics of small size, light weight, simple operation and convenient use. The inspection and test methods after installation of the electric hoist are as follows:

1. Check whether all lubricating parts have enough lubricating grease.

2. Whether the track combination is reliable.

3. The power supply at the installation site should be able to ensure that the input voltage of the motor is not less than 90% of the rated voltage when the motor is running (care should be taken to prevent the power supply voltage from being too long and the cross section too small, resulting in excessive voltage drop). Please pay attention to the phase sequence when turning on the power.

Electric Hoist

4. When the electric hoist is unloaded, turn on the power and carry out the forward and reverse test. Check the control buttons, stoppers, rope guides and other devices. At this time, the control circuit should be correct, and the running direction should be consistent with the direction indicated by the button. normal.

5. If the wire rope becomes loose and unwinding, it needs to be adjusted again.

6. Start the lifting and running mechanism at the rated load, and check whether the operation is normal, whether the sliding distance meets the regulations, and whether the reducer is leaking.

7. The position of the stop block of the limit rod device should be adjusted after installation, such as: make the electric hoist start without load, when the hook rises to a high position, the rope guide will touch the stop block on the right and push the limit rod—— The stopper cuts off the ascending circuit, and the hook stops ascending. At this time, the distance between the upper end surface of the pulley shell and the lower end surface of the drum shell should be 50-150mm. Similarly, when the hook is lowered to a low position, the descending circuit should be cut off. The hook stops descending. At this time, there must be 2-3 loops (safety loop) of steel wire rope on the drum.